Solar Attack Solar Attack

The subsidized intervention involved the installation of a new photovoltaic system with a peak power of 700 kWp and a nominal power of 700 kW on the roof of buildings owned by the Company in the headquarters and site located in the Municipality of San Giustino (PG) Via Mattei n. 35 – Altomare Industrial Area

Poster